This project was opened by the Grand Custodian of the Holy Shrines of Ahmadi and Muhammadi (PBUT) and some officials in Shiraz. The project includes four tunnels in the form of two twin tunnels which are adjacent to each other. The lengths of two small tunnels are 350 meters, and the two bigger tunnels are 1Km. and 900 meters.